Get In Touch
P.O. Box 62349 Al Qusais Plaza Bldg.
Damascus St., Al Qusais, Dubai, U.A.E
Work Inquiries
[email protected]
Ph: +971 4 263 5553
Back

Groundwork For Flood-Resilient Projects

The story of any storm water pond begins with the very first excavation. The site is carefully prepared, slopes are adjusted, and a solid base is established to support the subsequent construction stages. Precise work at this stage ensures the sustainability of the water system and its ability to protect the surrounding area from water accumulation and flooding.

FalaGroup
FalaGroup

This website stores cookies on your computer. Cookie Policy